Processing...

CCS - MV Bluefin 2017 V01 SST

Tools Click here to view this collection in the new DAP user interface

show summary fields  |   show all    
Tools



About this Collection

CCS - MV Bluefin 2017 V01 SST


A Hart-Fluke model 1523 digital thermometer with thermistor probe was installed in the ship’s seawater intake pipe upstream of the pump. Survey settings: Readings were recorded once per minute. Calibration Information: The instrument was calibrated at CSIRO in 2017.


Chemical Oceanography Physical Oceanography


https://doi.org/10.4225/08/5b28f1ead8624


14 Dec 2017


19 Dec 2017


CSIRO Enquiries
CSIROEnquiries@csiro.au
1300 363 400

CO2 CTD TSG


Gippsland Monitoring Network (GipNet) - http://www.co2crc.com.au/home/gipnet-gippsland-monitori ng-network/ ANLEC R&D - http://anlecrd.com.au/


CSIRO Data Licence


CSIRO (Australia)


Tilbrook, Bronte; Akl, John; Neill, Craig; Van Ooijen, Erik (2018): CCS - MV Bluefin 2017 V01 SST. v1. CSIRO. Data Collection. https://doi.org/10.4225/08/5b28f1ead8624


All Rights (including copyright) CSIRO 2018.


Access to this collection's metadata and/or files (if any) are restricted until 31 Dec 2025. Although the associated metadata is public, the files (if any) have not been approved for general release. Please phone or email the contact person for this collection to discuss access to the files.

show all

Location Details

38°11′24.72″ S


38°19′41.52″ S


147°28′45.12″ E


147°19′42.96″ E


WGS84


More about this Collection

BF2017_01


Bluefin 2017 Voyage 01



Environment
Geoscientific Information
Oceans






















FormatVersion
DIGITAL - Text Documents - ASCII0


OrganisationIndividual NamePositionRoleContact Information
CSIRODirk SlawinskiSenior Experimental Scientistdirk.slawinski@csiro.au


eng


UTF8


19-6-2018 03:23:45


19-6-2018 06:46:18


About this Project

Assessment of MMV methodologies for subsea CCS: seabed and water column monitoring


Project Overview: A range of solutions will be required to reach globally agreed emissions reductions targets for carbon dioxide (CO2). Carbon capture and storage (CCS) is part of the suite of technologies that will contribute to lowering atmospheric emissions of CO2 from Australia's energy system. There are a wide variety of technologies at var... more


Andrew Ross


underway SST


A Hart-Fluke model 1523 digital thermometer with thermistor probe was installed in the ship's seawater intake pipe upstream of teh pump. Survey settings: Readings were recorded once per minute.


Observation


Hart-Fluke model 1523 digital thermometer with thermistor probe


Bronte Tilbrook


John Akl


Craig Neill


Erik Van Ooijen


Similar collections

  • CCS - MV Bluefin 2017 V01 fCO2....
    view
  • CCS - MV Bluefin 2017 V01 TSG....
    view
  • CCS - MV Bluefin 2017 V01 Oxygen....
    view
  • CCS - MV Bluefin 2017 V01 Radon....
    view

Others were also interested in

  • CCS - MV Bluefin 2017 V01 pH....
    view
  • CCS - MV Bluefin 2017 V01 Smith McIntyre Grab Sediments....
    view
  • CCS - MV Bluefin 2017 V01 Methane....
    view
  • CCS - MV Seca 2018 V01 Diver Deployed Sediment Cores....
    view